Skip to content
🛡️ 5-YEAR REPLACEMENT WARRANTY ON ALL BREAKERS

Rotary Changeover Pakistan: EP 2P 3P 4P Guide

by CNC Electric Pakistan 29 May 2026

Rotary Changeover Switch Pakistan — EP Series 2P, 3P, 4P Position Diagrams

Updated: May 2026 · CNC Electric Pakistan

Rotary Changeover (EP Series) — Pakistan Quick Answer (2026)

The EP rotary changeover switch is a panel-mount or DIN-rail manual switch with a rotating handle that selects between two or more power sources. Used where the lever-style YCBZ changeover doesn't fit, where frequent switching is expected, or where a clean panel face is needed. Pakistan 2026 prices: EP 2P 63 A from Rs.1,700; EP 3P 100 A Rs.4,200; EP 4P 100 A Rs.5,500; EP 4P 250 A Rs.8,500; EP 4P 400 A Rs.13,500. Positions: 0-1 (off / on), 1-0-2 (source 1 / off / source 2), and 1-2-3-4 (four-position).

Browse: CNC EP Rotary Changeovers → · All Changeovers → · WhatsApp 0326-1111376

EP vs YCBZ — When to Use Each

CNC offers two main families of manual changeover:

  • YCBZ series — lever-handle changeover with built-in breaker function. Snap-mount on DIN rail. Cheaper. Best for DB box install.
  • EP series — rotary handle, separate from breaker function. Panel-mount or DIN-rail. More robust for frequent switching. Best for control panels, switchboards, where a clean rotary handle is preferred.

For most home backup installs (WAPDA ↔ generator) where switching happens 5-10 times a day, either works fine. EP wins when: (1) the switch is the primary user interface and aesthetic matters, (2) switching is very frequent (industrial), (3) higher current rating is needed than YCBZ goes to.

EP Position Configurations

2-Position (0-1 or I-II)

Simple on/off or source-1-or-source-2. Rotate 90° between positions. Used for: single source isolation, simple A/B selection.

3-Position (1-0-2)

Standard WAPDA / OFF / Generator pattern. Rotate 90° from centre OFF to either source. Mechanical interlock ensures the OFF position physically breaks before the other source can be selected — preventing momentary parallel connection.

4-Position (1-2-3-4)

Source selection between 4 sources. Used for: ammeter phase selection (R / Y / B / OFF), bus tie configurations, multi-source backup (WAPDA / generator 1 / generator 2 / solar).

CNC EP Series Range — Pakistan 2026

Model Poles Current Positions Price (PKR)
EP-2P-63 2P 63 A 1-0-2 Rs.1,700
EP-3P-63 3P 63 A 1-0-2 Rs.2,400
EP-3P-100 3P 100 A 1-0-2 Rs.4,200
EP-4P-100 4P 100 A 1-0-2 Rs.5,500
EP-4P-160 4P 160 A 1-0-2 Rs.6,800
EP-4P-250 4P 250 A 1-0-2 Rs.8,500
EP-4P-400 4P 400 A 1-0-2 Rs.13,500

Wiring an EP 1-0-2 Changeover (WAPDA / OFF / Gen)

  1. Source 1 (WAPDA) Live + Neutral (and Phases R Y B for 3-phase) → Source 1 input terminals (labelled 1L or 1U/V/W)
  2. Source 2 (Generator) Live + Neutral (and Phases) → Source 2 input terminals (labelled 2L or 2U/V/W)
  3. Load (house DB) → Common output terminals (labelled C or COMMON)
  4. Earths: WAPDA earth + generator earth + load earth all bonded at the main earth bar — NEVER switched through the changeover

Position 1: load connected to Source 1. Position 0: load disconnected from both sources (safe maintenance). Position 2: load connected to Source 2.

Common Wiring Mistakes

  • Wiring source 1 and source 2 neutrals together upstream. Creates a permanent ground loop. Each source's neutral stays separate until the changeover output.
  • Using a 2P changeover on a 3-phase circuit. Only switches 2 phases. The third stays connected. Use 4P for 3-phase + N.
  • Forgetting the OFF middle position. Direct rotation from source 1 to source 2 (skipping OFF) creates a brief parallel connection. Quality EP changeovers have a positive OFF detent and break-before-make contacts.
  • Undersizing on motor inrush. A 63 A EP feeding a 5 HP motor on startup sees 30 A inrush. The 63 A rating handles it, but a 32 A unit would weld. Match to FULL house load, not nominal.
  • Mounting in a hot enclosure without ventilation. EP switches above 100 A dissipate noticeable heat under load. Ventilate the enclosure or oversize.

Frequently Asked Questions

What is an EP rotary changeover switch?

A panel-mount or DIN-rail manual changeover with a rotating handle that selects between two or more power sources. The "EP" model designation refers to the CNC product line. Standard configurations: 2P, 3P, 4P; positions 0-1, 1-0-2, 1-2-3-4.

What is the price of an EP changeover in Pakistan?

CNC EP rotary changeovers Pakistan 2026: 2P 63 A Rs.1,700; 3P 100 A Rs.4,200; 4P 100 A Rs.5,500; 4P 250 A Rs.8,500; 4P 400 A Rs.13,500. Higher current variants available on order.

EP rotary or YCBZ lever — which is better?

Both work fine for home backup. EP is cleaner aesthetically (rotary handle on panel face), more robust for frequent switching, available at higher current ratings. YCBZ is cheaper and smaller, snap-mounts in any DB box. For most residential installs, the cost-effective YCBZ is sufficient.

Does the EP have a positive OFF position?

Yes. Quality EP changeovers (including all CNC models) have a detent in the centre OFF position and break-before-make contacts — physically guarantees both sources are disconnected during transition, preventing momentary parallel connection.

Can I use a 3-position EP for 3 sources?

No — the standard 1-0-2 has Source 1 / OFF / Source 2 only. For 3 sources, use the 1-2-3-4 four-position EP (which has no OFF position — rotates through 4 sources directly). Most 3-source applications use either 4-position EP or 2× 3-position EPs in series.

What size for a 5 kVA generator + 14 kW house load?

Size to the house main breaker (which the changeover protects), not to the generator capacity. A 14 kW house typically has a 63 A main breaker, so use an EP-2P-63 (Rs.1,700) for single-phase or EP-4P-63 for 3-phase. The changeover handles the load current, not generator output.

Does the EP need its own MCB?

Yes — at minimum a 2P or 4P MCB / MCCB on each source feeding into the EP, plus typically one on the load output side. The EP is for SWITCHING, not for OVERCURRENT PROTECTION — that's the breaker's job.

EP rotary changeover sized for your install

Send us your supply (1P or 3P), main breaker rating, sources (WAPDA / gen / solar) — we’ll spec the EP changeover + matching protection.

EP Changeovers →   |   All Changeovers →   |   WhatsApp: 0326-1111376

Related Collections & Guides

Prev Post
Next Post

Thanks for subscribing!

This email has been registered!

Shop the look

this is just a warning
Login
Shopping Cart
0 items
CNC Electric
Online — ready to help
All Voltage On-grid Hybrid Backup Smart Industrial