Pakistani Pharmacy / Clinic Backup Power Panel BoM 2026 — UPS, ATS, RCBO Sizing

by CNC Electric Pakistan 16 Jun 2026

What backup power does a Pakistani pharmacy or clinic need?

A Pakistani pharmacy/clinic needs three protection tiers: an online double-conversion UPS (3-15 kVA) for vaccine fridge + medical equipment continuity through load-shedding; an ATS-controlled diesel generator (8-25 kVA) for full-site backup; and 30 mA RCBOs on every patient-contact circuit per IEC 60364-7-710 "Medical Locations" requirements. Total backup investment for a typical 5 kW pharmacy: PKR 150K–350K. For a 15 kW clinic: PKR 400K–800K. Investment justification: a single vaccine-fridge failure during 4-hour outage can spoil PKR 100K-500K of stock; one outage event pays for the UPS.

Pakistani pharmacy load profile

Equipment Watts UPS-critical?
Vaccine fridge (2-8°C) 120 W (200 W inrush) YES
Insulin fridge (cold-chain backup) 100 W YES
POS terminal + receipt printer 80 W YES
CCTV + DVR 100 W YES
Internet router + WiFi AP 25 W YES
LED ceiling lights 200 W UPS only on emergency lights
Air conditioner 1,800 W Generator only
Water dispenser 90 W No

UPS-critical total: ~425 W — size online UPS at 1 kVA (2-3× headroom for inrush) with 30-min battery autonomy. For a small clinic add ultrasound (250 W), nebuliser (300 W), suction pump (300 W) and oxygen concentrator (350 W) → ~1.5 kVA UPS.

BoM — small Pakistani pharmacy (5 kW total, 0.5 kW UPS-critical)

Component Spec CNC SKU PKR
Online UPS 1 kVA tower Pure sine, 30 min runtime Allied (order) 35,000
Voltage protector at main 2P 40A YC7VA YC7VA-2P 40A 1,750
Main MCB 2P 32A C-curve YCB7-63N 900
UPS-bypass RCBO 1P+N 16A 30mA YCB6HLN 1P+N 1,750
Branch RCBOs (5 circuits) 1P+N 16-32A 30mA YCB6HLN × 5 9,000
Type 2 AC SPD 1P+N 20-40kA 275V YCS6-B 2,500
DB enclosure YCX6 12-way steel YCX6 4,300
Subtotal (pharmacy) ~55,200

Plus a small standby generator (3 kVA petrol or 5 kVA diesel = PKR 70-130K) brings total backup investment to PKR 125-185K. For a multi-room clinic add 15 kVA generator + manual changeover (PKR 220K) and 3 kVA UPS for medical equipment.

Mid-size clinic (15 kW connected, 2 kW UPS-critical) — BoM

  • Online UPS 3 kVA tower + extended-battery cabinet for 1 hour autonomy — PKR 110,000
  • Voltage protector YC7VA-2P-KWH WiFi 63A at main — PKR 5,200
  • Main MCCB 4P 63A YCM7 (3-phase service) — PKR 6,800
  • RCBOs per circuit (medical contact = 30 mA, lighting/AC = 100 mA selectivity) — PKR 12,000 total
  • ATS YCQ1B 2P 63A for generator switchover — PKR 6,700
  • Type 2 SPD 4P 385V at main + 1P+N at UPS output — PKR 8,000
  • 15 kVA standby diesel generator — PKR 320,000 (separate from electrical BoM)
  • Total switchgear excluding generator — ~PKR 150,000

Why 30mA RCBO is mandatory in medical locations

IEC 60364-7-710 "Medical Locations" requires:

  • Group 0 (waiting room, office): standard 30 mA RCD/RCBO on sockets — same as residential.
  • Group 1 (consulting room, X-ray, dialysis): 30 mA RCD on socket circuits + redundant earthing + equipotential bonding.
  • Group 2 (operating theatre, ICU, cardiology): Medical IT system (isolated, ungrounded) with insulation-monitoring — standard RCBOs replaced with line-isolation monitors.

Most Pakistani pharmacies and small clinics fall under Group 0 / Group 1, where 30 mA RCBO on every socket is sufficient. Hospital ORs and ICUs need the Medical IT system — outside scope of this guide.

Common Pakistani pharmacy/clinic installer mistakes

  1. Vaccine fridge on a regular line-interactive UPS — switchover transient kills compressor. Use online double-conversion only.
  2. Skipping voltage protector at main — broken-neutral 415V destroys all electronic equipment simultaneously.
  3. 30 mA RCBO on the geyser — nuisance trips. Use 100 mA on geyser circuits.
  4. Sharing UPS output with AC — AC compressor inrush trips UPS bypass. Separate AC to generator-only side.
  5. No SPD on UPS output — lightning surge propagates through UPS to medical equipment. Add Type 2 SPD downstream.
  6. Cold-chain failure logging missing — if vaccine spoils, you need temperature log to claim insurance. Use a WiFi temperature data-logger.

Buy + related

RCBO YCB6HLN family · YC7VA voltage protector · ATS YCQ family · AC SPD YCS6-B · Stabilizer vs Protector vs UPS guide

Prev Post
Next Post

Thanks for subscribing!

This email has been registered!

Shop the look

this is just a warning
Login
Shopping Cart
0 items
CNC Electric
Online — ready to help
All Voltage On-grid Hybrid Backup Smart Industrial